Hi Brad,
Of all the suggestions discussed here, you need to check following,
- Inspection type 04 is 'active' in material master QM view for this material. This is what you have to cross check again.
- Correct your usage in the inspection plan. Change it to 1 from 5 as I shown in snapshot earlier. This is one reason you don't see an inspection lot in QE51N because even if your lots are generating, they are creating with CRTD status and thus not visible.
Once inspection type is active and correct usage is assigned, create and release a new production order. You would get the early inspection lot for RR in QE51N.
ntn