Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 8627

unplanned rework trigger points

$
0
0

Hi,

    I am well aware of how to use trigger points in routings and all the activities one can do with it. However mentioning trigger points in routings may not always work as on the production floor rework could be reported on any operation of the prd order. Trigger points in routings is for planned rework. Is there anyway to insert a trigger point during operation confirmation at any operation in the prod order? I know I can insert an opn manually and then update the rework operation qty in the opn details. But I want to insert the ref opn set whenever I confirm rework in CO11N and let the rework operation inherit the confirmed rework qty.

 

Thanks


Viewing all articles
Browse latest Browse all 8627

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>