Hi,
We are experiencing an issue in the put away process in Bulk Storage.
Example: on 8/13/2014 we did GR and system automatically create TO to putway in Bin1. We have one more GR today (8/14/2014) and system created a TO to putaway in the same Bin. We don't want to store the material with different GR date in the same Bin.
Storage Type Config:
Putaway Strategy:B
Mixed Storage: A
Addn to stoc : X
Block upon stock plcmt: Empty
Storage Type Control:
Combined Putaway: Not checked
Partial Qty Mangt: Checked
Blocked for Putaway: Not Checked
Time Limit: 1
Total : 2
Thanks
Aravanan